State of affairs
Request for lifting and positioning of glass inside a private villa with very narrow access spaces.
Type of intervention
Transport and handling of the M400 crawler crane inside a private villa with difficult access spaces for the installation of glass inside sliding windows.
| CRANE used | M400 |
| Costumer | Vecchiato Autotrasporti Srl |
| Time | 4 hours |
| Field of activity | Commercial construction |




